AgriMotion Engineering
    AgriMotion engineers on a project site
    All solutions · PAN-India EPC

    End-to-End Agri-Infrastructure. One Accountable Partner.

    Cold rooms, PUF structures, Daikin refrigeration, mushroom farms, polyhouses, hydroponics, packhouses and farm solar — designed, built and commissioned by one team, with the DPR and subsidy file prepared alongside. Every solution page we publish is indexed below.
    8
    verticals, one team
    25
    service & specialist pages
    6
    subsidy schemes covered
    7
    planning tools
    Every solution page

    The full index, by what you’re building.

    Service pages explain the whole scope; specialist pages go deep on one product or room type. Calculators and explainers sit beside each.

    PUF panels
    Part of NHB / MIDH-funded cold-chain projects
    Service pages
    Mushroom projects
    NHB integrated mushroom unit — 35% / 45%PMEGP for smaller units — 15–35%
    Polyhouse & net house
    MIDH — 50% of cost norm, up to 2,500 m²State horticulture mission top-ups
    Warehousing & packhouse
    AIF — 3% interest subvention up to ₹2 croreNHB / MIDH pack-house assistance
    Specialist pages
    Solar for agriculture
    PM-KUSUM — farm solar pumpsPM Surya Ghar — residential rooftops
    Subsidy & DPR

    Funding, mapped before you build.

    Bankable DPRs and scheme documentation, prepared by the engineers who design the project. Subsidy is sanctioned by the scheme authority and is never guaranteed.

    Subsidy consulting
    Start a project

    Tell us what you’re building.

    A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.

    • An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
    • An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
    • No obligationYour details are used only to reply to this enquiry.
    Your details
    Your project

    No spam. Indicative estimate only — final quotation depends on site condition, specifications and current material rates.