FPO / Farmer Godown
- PEB structure + GI sheet
- DPC + concrete flooring
- Single bay with ventilation
- WDRA registration support
- NABARD documentation
Eight verticals, one engineering team — from the first survey to the last commissioning signature.
Condensing units, ZEAS and Conveni-Pack sized, supplied and commissioned by our own team.
Explore Daikin rangeBankable DPRs and scheme documentation, prepared by the engineers who design the project.
Tell us the crop, capacity and state. We map every scheme you can stack, before you spend on a DPR.
Check my eligibilityInstrument-grade calculators built on the same cost norms our engineers quote from.
Calculators give the range. Our engineers turn it into a site-specific BOQ with subsidy mapped.
Request an estimateGuides, cost breakdowns and state-by-state playbooks written by project engineers.
Design norms, cost sheets, DPR samples and scheme notes — organised the way a project is built.
Open the resource library
A 5,000 MT PEB warehouse typically costs ₹2.5–3.5 crore depending on land development, flooring spec, height, insulation and add-ons like weighbridges and dock-levellers. AIF subvention reduces effective interest cost by 3% on loans up to ₹2 crore. A modern agri warehouse is no longer a four-wall godown.
A modern agri warehouse is no longer a four-wall godown. It is a financial instrument — WDRA registration unlocks negotiable warehouse receipts (NWR), which farmers and traders pledge to banks for working capital at 7–9%. AgriMotion delivers PEB warehouses engineered for scientific storage, AIF compliance and WDRA registrability from day one.
A typical end-to-end delivery covers planning through post-handover support.
Hot-dip galvanised primary frames + secondary purlins, designed to IS-875 wind and seismic codes.
Pre-painted GI / GP sheeting with optional rockwool / PUF insulation for temperature-sensitive grain.
DPC + VDPC flooring, ventilation cowls, rodent / bird guards, fumigation provisions.
Loading docks, dock-levellers, ramps, dunnage and optional weighbridge integration.
Registration documentation, dimensional drawings, declaration filings and bank tie-up support.
Bankable DPR with cash-flow, ROI, repayment schedule and AIF / bank loan filing.
Each stage closes before the next one opens — nothing is ordered before the design is locked.
Land, capacity, commodity and finance feasibility.
PEB design, structural drawings, BOQ + cash-flow.
AIF + WDRA documentation filing.
Civil, PEB erection, sheeting, flooring, WDRA registration.
Indicative ranges only. Final cost depends on site, capacity, automation level, structural design, material grades and freight.
All figures indicative and subject to revision. Subsidy approval depends on the sanctioning authority and current scheme guidelines.
Most project failures start where one vendor’s scope ends and the next one’s begins. We carry the whole scope — and the paperwork that funds it.
| Scope | AgriMotion | Local | DIY |
|---|---|---|---|
| Bankable DPR + BOQ | |||
| OEM-genuine components | |||
| Engineering drawings (GA / P&ID / SLD) | |||
| Subsidy filing (NHB / MIDH / AIF) | |||
| Single-point project ownership | |||
| Post-handover AMC |
Still unsure? Speak to an engineer — not a sales desk.
A 5,000 MT PEB warehouse typically costs ₹2.5–3.5 crore depending on land development, flooring spec, height, insulation and add-ons like weighbridges and dock-levellers. AIF subvention reduces effective interest cost by 3% on loans up to ₹2 crore.
WDRA registration is optional but highly recommended — it is the only way to issue Negotiable Warehouse Receipts (NWR), which depositors can pledge to banks for working-capital loans up to 70% of stored produce value at 7–9% interest.
A 2,000 MT PEB warehouse takes 60–75 days post-civil. A 10,000 MT facility takes 90–120 days. PEB is 40–50% faster than conventional RCC, enabling capture of the next harvest season.
The Agriculture Infrastructure Fund (AIF) provides a 3% interest subvention on loans up to ₹2 crore for agri infrastructure including warehouses. Over a 7-year tenure, the subvention saves ₹6–8 lakh per crore borrowed.
Yes, multi-commodity storage is permitted with proper segregation, dunnage and fumigation. Cold-sensitive items require insulated bays or cold-storage integration. AgriMotion designs flexible bay layouts for multi-commodity operations.
AgriMotion offers full turnkey EPC — land development, PEB design and erection, flooring, electrical, WDRA + AIF documentation and handover. Design-only consultancy is offered for projects above 25,000 MT.
Pricing ranges shown are indicative only and depend on site, scale, material grades, structural design, freight and current market conditions. Subsidy approval depends on the sanctioning authority and current scheme guidelines.
A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.