AgriMotion Engineering
    Bankable DPR Consulting by AgriMotion
    DPR Consulting

    Bankable DPR Consulting — NABARD, NHB, AIF, MoFPI & Banks

    Detailed Project Reports written to NABARD / NHB / AIF / MoFPI templates — with CMA data, cash-flow, sensitivity analysis and engineering BOQ that banks and sanctioning authorities approve without rework.
    600+
    DPRs Delivered
    15 – 30 days
    Turnaround
    ₹25k – ₹4 L
    Fee Range
    92%
    Sanction Rate
    At a glance
    • NABARD / NHB format
    • CMA + cash-flow
    • Bank-approved templates
    • Subsidy filing
    Talk to an engineer · +91 75799 75795

    In short.

    A bankable DPR is a Detailed Project Report drafted in the format required by banks or subsidy authorities (NABARD, NHB, MIDH, AIF, MoFPI). It contains engineering BOQ, financial projections, ROI analysis, statutory compliance documents and applicant KYC — packaged to clear sanction at first review.

    By Updated
    Overview

    A DPR is not paperwork — it is a sanction-engineered document

    Banks and subsidy bodies reject 40% of DPRs in the first review. The reasons are predictable — missing CMA data, unrealistic cash-flow, weak engineering basis, wrong scheme template. AgriMotion writes DPRs that pass the desk officer’s checklist in the first reading. We use the same engineering team that builds the project, so the BOQ, capacity and ROI math is defensible.

    What you get
    • 01NABARD / NHB / MIDH / AIF / MoFPI scheme-specific templates
    • 02CMA data with 7-year cash-flow and DSCR / IRR / BEP analysis
    • 03Engineering BOQ from in-house EPC team — not desk estimates
    • 04Sensitivity analysis (price, yield, cycle, utilisation)
    • 05Geo-tagging, site photos, technical drawings and ownership documents
    • 06Bank / sanctioning body coordination until sanction letter
    Scope of work

    What’s included in an AgriMotion project.

    A typical end-to-end delivery covers planning through post-handover support.

    Scope my project

    Scheme-Specific Drafting

    DPR written to NABARD / NHB / MIDH / AIF / MoFPI / state mission templates — not a generic template.

    02

    CMA + Financials

    7-year P&L, cash-flow, BEP, DSCR, IRR, payback and sensitivity analysis with assumption sheets.

    03

    Engineering BOQ

    Itemised civil, structural, mechanical and electrical BOQ prepared by our in-house EPC team.

    04

    Technical Validation

    Drawings, capacity calculations, refrigeration / load sizing and process flow validated by domain engineers.

    05

    Bank + Subsidy Liaison

    Coordination with bank desk officers, NABARD / NHB / AIF cells until sanction letter.

    Compliance Pack

    Geo-tagging, KYC, ownership, land documents, NOC, environment and statutory filings as required.

    Project process

    From enquiry to commissioning.

    Each stage closes before the next one opens — nothing is ordered before the design is locked.

    1. 01

      Briefing

      Project type, capacity, location, budget intake.

    2. 02

      Drafting

      BOQ, drawings, CMA, cash-flow, scheme alignment.

    3. 03

      Filing

      Bank / NABARD / NHB / AIF / MoFPI filing.

    4. 04

      Sanction

      Query handling and follow-up till sanction letter.

    Indicative pricing

    Project ranges and subsidy support.

    Indicative ranges only. Final cost depends on site, capacity, automation level, structural design, material grades and freight.

    Small Projects

    Compact DPR

    ₹25k – ₹60k
    Indicative project range
    PMEGP / NHB Tier-1
    • Up to ₹50 L project size
    • Standard scheme template
    • Basic CMA + cash-flow
    • BOQ + drawings included
    • One revision included
    Get an exact quote
    Mid-size CommercialMost enquired

    Bankable DPR

    ₹60k – ₹1.5 L
    Indicative project range
    NABARD / NHB / MIDH / AIF
    • ₹50 L – ₹5 Cr project size
    • 7-yr cash-flow + DSCR / IRR / BEP
    • Sensitivity + risk analysis
    • Engineering BOQ + drawings
    • Bank coordination
    • Two revisions included
    Get an exact quote
    Enterprise

    Industrial / MoFPI DPR

    ₹1.5 – ₹4 L+
    Indicative project range
    MoFPI / AIF / NABARD
    • ₹5 Cr+ project size
    • MoFPI PMFME / PMKSY format
    • Detailed engineering + civil drawings
    • Multi-scheme stacking analysis
    • Sanction-stage hand-holding
    • Lender / approval-body liaison
    Get an exact quote

    All figures indicative and subject to revision. Subsidy approval depends on the sanctioning authority and current scheme guidelines.

    Why AgriMotion

    Engineered end-to-end, not pieced together.

    Most project failures start where one vendor’s scope ends and the next one’s begins. We carry the whole scope — and the paperwork that funds it.

    • One engineering teamDesign, EPC, refrigeration and agronomy under one roof — one party answers for the result.
    • DPR and BOQ in-houseBankable reports prepared for NHB, NABARD, AIF and state horticulture applications.
    • PAN-India executionSingle-point project ownership from survey to handover, with post-handover support.
    • Itemised quotationsLine-item pricing with make and specification — no vague lump sums.

    Engineered EPC vs local contractor vs DIY

    ScopeAgriMotionLocalDIY
    Bankable DPR + BOQ
    OEM-genuine components
    Engineering drawings (GA / P&ID / SLD)
    Subsidy filing (NHB / MIDH / AIF)
    Single-point project ownership
    Post-handover AMC
    Included Partly Usually not
    Questions

    Before you call us.

    Still unsure? Speak to an engineer — not a sales desk.

    What is a bankable DPR?

    A bankable DPR is a Detailed Project Report drafted in the format required by banks or subsidy authorities (NABARD, NHB, MIDH, AIF, MoFPI). It contains engineering BOQ, financial projections, ROI analysis, statutory compliance documents and applicant KYC — packaged to clear sanction at first review.

    How long does it take to prepare a DPR?

    A compact DPR for a ₹25–50 lakh project takes 10–15 days. A bankable mid-size DPR (₹50 L–5 Cr) takes 20–30 days. Large MoFPI / AIF DPRs over ₹5 crore take 30–45 days including engineering drawings and multi-scheme analysis.

    What is the fee for a DPR?

    Compact DPRs start at ₹25,000. Bankable mid-size DPRs cost ₹60,000–₹1.5 lakh. Industrial / MoFPI-class DPRs cost ₹1.5–4 lakh. Fee depends on project size, scheme complexity, engineering depth and revision rounds.

    Do you guarantee subsidy or loan sanction?

    No DPR consultant can guarantee sanction — final approval rests with the bank / sanctioning authority. AgriMotion maintains a 90%+ first-pass acceptance rate by writing to the exact template and supporting the file till sanction.

    Do you support post-sanction execution?

    Yes. If AgriMotion executes the project as EPC, our DPR consulting fee is fully adjusted against the EPC contract value. We also assist with subsidy claim filing and joint-inspection coordination.

    Which schemes do you cover?

    NABARD (Rural Godown, AIF, RIDF), NHB (cold storage, polyhouse), MIDH (protected cultivation, post-harvest), AIF (3% interest subvention), MoFPI (PMFME, PMKSY), PMEGP, PM-KUSUM, state horticulture missions and bank term-loan files.

    Project pricing & subsidy disclaimer

    Pricing ranges shown are indicative only and depend on site, scale, material grades, structural design, freight and current market conditions. Subsidy approval depends on the sanctioning authority and current scheme guidelines.

    Sources

    The documents behind the figures.

    Official scheme documents for the rates on this page. Scheme rules change — confirm the current circular with the sanctioning authority before you apply.

    1. 01
      NHB Operational Guidelines, January 2025(official document, opens in a new tab)

      “National Horticulture Board Operational Guidelines JANUARY 2025”

      National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India · January 2025 · Read and archived

    2. 02
      NHB Public Circular, 21 August 2026 (revised rates: 35% / 45%)(official document, opens in a new tab)

      “PUBLIC CIRCULAR No.NHB/CC/Guidelines/2026-27”

      National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India · 21 August 2026 · Read and archived

    3. 03
      MIDH Operational Guidelines 2025(official document, opens in a new tab)

      “OPERATIONAL GUIDELINES MISSION FOR INTEGRATED DEVELOPMET OF HORTICULTURE”

      Department of Agriculture & Farmers Welfare, Government of India (published on nhb.gov.in) · 31 December 2024 · Read and archived

    4. 04
      Agriculture Infrastructure Fund (AIF) — Revised Scheme Guidelines(official document, opens in a new tab)

      “Scheme Guidelines for CENTRAL SECTOR SCHEME of Financing facility under 'Agriculture Infrastructure Fund'”

      Department of Agriculture & Farmers Welfare, Ministry of Agriculture & Farmers Welfare, Government of India · September 2024 · Read and archived

    5. 05
      PMKSY Integrated Cold Chain & Value Addition Infrastructure (2025 revision)(official document, opens in a new tab)

      “Pradhan Mantri Kisan Sampada Yojana "Scheme for Integrated Cold Chain & Value Addition Infrastructure"”

      Ministry of Food Processing Industries, Government of India · 22 May 2025 · Read and archived

    Start a project

    Tell us what you’re building.

    A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.

    • An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
    • An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
    • No obligationYour details are used only to reply to this enquiry.
    Your details
    Your project

    No spam. Indicative estimate only — final quotation depends on site condition, specifications and current material rates.