    Commercial Mushroom Farm Setup by AgriMotion
    Mushroom Projects

    Commercial Mushroom Farm Setup — Production, Cold Rooms & Compost

    Turnkey engineering for button mushroom production units — PUF-insulated cropping rooms, post-harvest cold rooms, aluminium rack systems, compost & spawn-flow infrastructure, with bankable DPR and subsidy filing.
    20 – 5,000 MT/yr
    Project Output
    4 – 6 tier
    Rack Systems
    ₹35 L – ₹6 Cr
    Capex Range
    NHB / SHM
    Subsidy Mapping
    At a glance
    • 16–18 °C cropping control
    • 85–95% RH humidification
    • NHB / state subsidy support
    • Daikin refrigeration
    Talk to an engineer · +91 75799 75795

    In short.

    A small starter unit (20–50 MT/yr) typically costs ₹35–75 lakh. A commercial farm (100–500 MT/yr) ranges between ₹85 lakh and ₹2.5 crore. Large industrial plants (1,000+ MT/yr) cross ₹3 crore. Final cost depends on civil, refrigeration brand, automation level, rack metallurgy and location.

    By Updated
    Overview

    Engineered for predictable yield, not improvisation

    Mushroom farming is climate-physics. We engineer the building envelope, airflow, humidification and rack utilisation around your crop cycle so every harvest is repeatable. From a single 20 MT/yr starter unit to multi-room 5,000 MT/yr commercial farms, our turnkey approach removes guesswork from civil, refrigeration and process design.

    What you get
    • 01PUF-insulated cropping rooms with food-grade hygienic finishes
    • 02Lateral airflow + ducted distribution for uniform RH and temperature
    • 03Aluminium rack systems engineered for crop cycle and harvest reach
    • 04Compost flow: Phase-1 bunker + Phase-2 tunnel infrastructure planning
    • 05Post-harvest cold rooms at 2–4 °C for shelf-life extension
    • 06Bankable DPR for NHB, NABARD, AIF and state horticulture schemes
    Scope of work

    What’s included in an AgriMotion project.

    A typical end-to-end delivery covers planning through post-handover support.

    Scope my project

    Cropping Rooms

    PUF-insulated halls engineered for repeatable yield, lateral airflow and hygienic finishes.

    02

    Post-Harvest Cold Room

    2–4 °C cold storage with Daikin / Bitzer refrigeration, dispatch staging and shelf-life management.

    03

    Compost & Spawn Flow

    Phase-1 bunker / Phase-2 tunnel concepts, blower sizing, plenum design and process movement.

    04

    Aluminium Rack Systems

    4–6 tier modular racks for crop cycle, harvest reach and ventilation distribution.

    05

    AHU + Humidification

    Air handler sizing, steam/ultrasonic humidifiers, fresh-air make-up, exhaust and CO₂ monitoring.

    EPC + Post-Handover AMC

    Single-point project ownership with annual maintenance, agronomy support and spare-parts assistance.

    Project process

    From enquiry to commissioning.

    Each stage closes before the next one opens — nothing is ordered before the design is locked.

    1. 01

      Feasibility

      Site, crop, output and budget assessment.

    2. 02

      Design + BOQ

      Room layout, refrigeration sizing, transparent itemised BOQ.

    3. 03

      DPR + Subsidy

      Bankable DPR + NHB / SHM / AIF filing support.

    4. 04

      Execute + Handover

      PUF + refrigeration + electrical + commissioning + AMC.

    Indicative pricing

    Project ranges and subsidy support.

    Indicative ranges only. Final cost depends on site, capacity, automation level, structural design, material grades and freight.

    Pilot / Small

    Starter Mushroom Unit

    ₹35 – ₹75 L
    Indicative project range
    NHB 35% / MIDH 40%
    • 1–2 cropping rooms (20–50 MT/yr)
    • PUF envelope + basic AHU
    • 4-tier aluminium racks
    • Compost sourcing guidance
    • DPR + scheme filing
    Get an exact quote
    ProductionMost enquired

    Commercial Mushroom Farm

    ₹85 L – ₹2.5 Cr
    Indicative project range
    NHB 35% or MIDH 40%
    • 3–6 cropping rooms (100–500 MT/yr)
    • Daikin refrigeration + humidification
    • 5–6 tier rack system
    • Cold room + dispatch staging
    • In-house compost coordination
    • Complete bankable DPR
    Get an exact quote
    Enterprise

    Industrial Mushroom Plant

    ₹2.8 – ₹6 Cr+
    Indicative project range
    AIF + MoFPI applicable
    • Multi-room (1,000–5,000 MT/yr)
    • Integrated Phase-1/2 compost units
    • Process automation + controls
    • Cold room + packaging line
    • PAN-India project management
    • Full EPC + post-handover AMC
    Get an exact quote

    All figures indicative and subject to revision. Subsidy approval depends on the sanctioning authority and current scheme guidelines.

    Why AgriMotion

    Engineered end-to-end, not pieced together.

    Most project failures start where one vendor’s scope ends and the next one’s begins. We carry the whole scope — and the paperwork that funds it.

    • One engineering teamDesign, EPC, refrigeration and agronomy under one roof — one party answers for the result.
    • DPR and BOQ in-houseBankable reports prepared for NHB, NABARD, AIF and state horticulture applications.
    • PAN-India executionSingle-point project ownership from survey to handover, with post-handover support.
    • Itemised quotationsLine-item pricing with make and specification — no vague lump sums.

    Engineered EPC vs local contractor vs DIY

    ScopeAgriMotionLocalDIY
    Bankable DPR + BOQ
    OEM-genuine components
    Engineering drawings (GA / P&ID / SLD)
    Subsidy filing (NHB / MIDH / AIF)
    Single-point project ownership
    Post-handover AMC
    Included Partly Usually not
    Questions

    Before you call us.

    Still unsure? Speak to an engineer — not a sales desk.

    What is the cost of a commercial mushroom farm in India?

    A small starter unit (20–50 MT/yr) typically costs ₹35–75 lakh. A commercial farm (100–500 MT/yr) ranges between ₹85 lakh and ₹2.5 crore. Large industrial plants (1,000+ MT/yr) cross ₹3 crore. Final cost depends on civil, refrigeration brand, automation level, rack metallurgy and location.

    Is subsidy available on mushroom projects?

    Yes. For a private promoter, MIDH (through the State Horticulture Mission) pays 40% of the cost norm on mushroom production, spawn and compost units (50% in NE & Himalayan states), and NHB pays 35% (45% in NE/hilly areas) on integrated mushroom units — one scheme per project component, never both. AIF can add a 3% interest subvention on the bank loan. Approval depends on project type, location, applicant category and the sanctioning authority. AgriMotion files the documentation on your behalf.

    What temperature and humidity is needed for button mushroom cultivation?

    Cropping rooms typically run at 16–18 °C with 85–95% relative humidity during the cropping cycle. Spawn-run requires 22–24 °C. Post-harvest cold rooms are held at 2–4 °C. We engineer the AHU, humidifier, fresh-air and exhaust loop to maintain these set points uniformly.

    Do you provide compost or only infrastructure?

    AgriMotion executes compost infrastructure (Phase-1 bunker, Phase-2 tunnel, aeration plenum). For ready compost supply, we coordinate with vetted regional compost suppliers based on your location. Many of our clients eventually set up in-house compost units after stabilising production.

    How long does a mushroom project take to commission?

    A small starter unit takes 90–120 days from order. A commercial 100–500 MT/yr farm takes 4–6 months. Industrial multi-room plants take 8–12 months. Timeline depends on civil readiness, equipment lead time and any subsidy / DPR approvals running in parallel.

    Do you support post-handover AMC and agronomy?

    Yes. We offer annual maintenance contracts (AMC) for refrigeration, AHU and controls, plus spare-parts assistance. For agronomy support during crop cycles, we connect clients to experienced mushroom consultants in our network.

    Project pricing & subsidy disclaimer

    Pricing ranges shown are indicative only and depend on site, scale, material grades, structural design, freight and current market conditions. Subsidy approval depends on the sanctioning authority and current scheme guidelines.

    Start a project

    Tell us what you’re building.

    A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.

    • An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
    • An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
    • No obligationYour details are used only to reply to this enquiry.
    Your details
    Your project

    No spam. Indicative estimate only — final quotation depends on site condition, specifications and current material rates.