AgriMotion Engineering
    Explainer · Mushroom

    Mushroom cold room: temperature, humidity & airflow

    In short.

    A button mushroom room changes setpoint by crop stage: spawn run at 22–25°C and 90–95% RH, pinning at 16–18°C, cropping at 14–17°C and 85–90% RH. Humidity matters as much as temperature — low humidity dries out pins, while high humidity without airflow causes disease. Walls and roof are typically 100 mm PUF with hygienic GI, PPGI or SS finishes.

    On this page5 sections
    1. 01Stage-wise setpoints (button mushroom)
    2. 02Humidity & fresh air
    3. 03PUF spec
    4. 04Project checklist
    5. 05Frequently asked

    A mushroom cold room is not a generic cold room. Setpoints change by crop stage and tight humidity control matters as much as temperature. Here is how we engineer mushroom rooms.

    Stage-wise setpoints (button mushroom)

    Indicative ranges.

    • Spawn run: 22–25°C, 90–95% RH
    • Case run: 22–24°C, 90–95% RH
    • Pinning: 16–18°C, 90–95% RH
    • Cropping: 14–17°C, 85–90% RH

    Humidity & fresh air

    Humidification via fogger / ultrasonic + insulated ducting. Fresh-air exchange controlled by CO₂ sensors during cropping.

    PUF spec

    100 mm walls and roof typical, with hygienic GI / PPGI / SS finishes and proper cove joints.

    Before you commit

    Project checklist.

    • 01Setpoint plan per crop stage
    • 02Humidifier capacity sized to room volume
    • 03Fresh-air & CO₂ control designed
    • 04Refrigeration coil sized to handle latent + sensible load
    • 05PUF spec & joint detailing approved
    Questions

    Frequently asked.

    Short answers from the engineering team. Ask us anything the article does not cover.

    Why does humidity matter as much as temperature?

    Low humidity dries out pins and reduces yield; high humidity without airflow causes disease. Maintaining both is what separates engineered rooms from generic cold rooms.

    Share your brief

    Planning a mushroom project?

    Share your brief — our engineering team will respond within 24 hours with an indicative estimate and next steps.

    • An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
    • An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
    • No obligationYour details are used only to reply to this enquiry.
    Your details
    Your project

    No spam. Indicative estimate only — final quotation depends on site condition, specifications and current material rates.