AgriMotion Engineering
    Subsidy & Bank Loan by AgriMotion
    Agri Subsidy & Loan Consulting

    Subsidy & Bank Loan Support for Agri Projects

    DPR preparation, scheme mapping, bank loan tie-up and post-sanction compliance — single window for promoters.

    In short.

    AgriMotion's project-finance team supports promoters from idea to disbursement. We prepare bankable DPRs, map your project to the right central / state schemes, coordinate with banks for term loan sanction, and assist with post-sanction compliance and subsidy release. Typical timelines: NHB 4–9 months, MIDH 3–6 months, PMEGP 60–120 days (sanction), with subsidy release post-commissioning and inspection.

    By Updated
    Subsidy & Bank Loan

    Schemes we work on

    1. 01NHB Subsidy — cold storage & post-harvest
    2. 02MIDH — protected cultivation, mushroom, F&V
    3. 03PMEGP — micro & small agri-units
    4. 04PMFME — food processing micro enterprises
    5. 05AIF (DA&FW) — 3% interest subvention on loans up to ₹2 cr
    6. 06PM-KUSUM — solar pumps & off-grid solar
    7. 07APEDA — export-oriented infrastructure
    8. 08State horticulture missions
    Subsidy & Bank Loan

    Our deliverables

    Project concept note, detailed DPR, financial projections (P&L, balance sheet, DSCR, IRR), technical drawings, BOQ, scheme application, bank coordination, sanction follow-up and subsidy claim filing.

    Disclaimer

    AgriMotion is a project consulting and EPC company. We do not guarantee subsidy approval — final sanction depends on the scheme authority and the borrower's eligibility. Our role is to maximize technical & financial fit.

    How we compare

    Agri Subsidy & Loan Consulting, engineered end-to-end.

    One team carries the design, the equipment, the site work and the scheme paperwork — so nothing falls between two vendors.

    • One engineering teamDesign, EPC, refrigeration and agronomy under one roof — one party answers for the result.
    • DPR and BOQ in-houseBankable reports prepared for NHB, NABARD, AIF and state horticulture applications.
    • PAN-India executionSingle-point project ownership from survey to handover, with post-handover support.
    • Itemised quotationsLine-item pricing with make and specification — no vague lump sums.

    Engineered EPC vs local contractor vs DIY

    ScopeAgriMotionLocalDIY
    Bankable DPR + BOQ
    OEM-genuine components
    Engineering drawings (GA / P&ID / SLD)
    Subsidy filing (NHB / MIDH / AIF)
    Single-point project ownership
    Post-handover AMC
    Included Partly Usually not
    Questions

    Before you call us.

    Still unsure? Speak to an engineer — not a sales desk.

    How long does subsidy approval take?

    Typical timelines: NHB 4–9 months, MIDH 3–6 months, PMEGP 60–120 days (sanction), with subsidy release post-commissioning and inspection.

    Do you provide CA-certified financials?

    We prepare projections in-house and coordinate with empanelled CAs for certification where the bank requires it.

    Can I get 100% loan?

    No — banks fund 70–80% of project cost; the balance must come as promoter margin (own contribution).

    AgriMotion Engineering Pvt. Ltd. is a project consulting and EPC company. Indicative prices, capacity bands and timelines on this page are typical benchmarks and are NOT a binding quotation. Final pricing depends on site survey, BOQ freeze, brand/specification of components, civil interface, GST and logistics. Subsidy approval is governed by the respective scheme authority and is not guaranteed.

    Start a project

    Request a project quotation.

    Share your requirement — capacity, site location, intended produce — and we'll send a tentative BOQ.

    • An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
    • An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
    • No obligationYour details are used only to reply to this enquiry.
    Your details
    Your project

    No spam. Indicative estimate only — final quotation depends on site condition, specifications and current material rates.