Single-Component NHB
- Bankable DPR (NHB template)
- Online portal filing
- PFMS / DBT setup
- Bank coordination
- Inspection follow-up
Eight verticals, one engineering team — from the first survey to the last commissioning signature.
Condensing units, ZEAS and Conveni-Pack sized, supplied and commissioned by our own team.
Explore Daikin rangeBankable DPRs and scheme documentation, prepared by the engineers who design the project.
Tell us the crop, capacity and state. We map every scheme you can stack, before you spend on a DPR.
Check my eligibilityInstrument-grade calculators built on the same cost norms our engineers quote from.
Calculators give the range. Our engineers turn it into a site-specific BOQ with subsidy mapped.
Request an estimateGuides, cost breakdowns and state-by-state playbooks written by project engineers.
Design norms, cost sheets, DPR samples and scheme notes — organised the way a project is built.
Open the resource library
NHB (National Horticulture Board, under Ministry of Agriculture) provides credit-linked back-ended capital subsidy for horticulture infrastructure — cold storage, polyhouse, packhouse, ripening chambers and integrated post-harvest projects. The subsidy is 35% of eligible cost (45% in NE, Himalayan and special areas), released into a no-lien account after physical verification and project commissioning.
NHB is the cornerstone subsidy body for horticulture in India — covering cold storage, controlled atmosphere stores, hi-tech polyhouses, ripening chambers, packhouses, primary processing units and integrated cold-chain projects. The subsidy is back-ended and credit-linked, released into a no-lien account after physical verification and project commissioning.
A typical end-to-end delivery covers planning through post-handover support.
Multi-chamber cold storage, controlled atmosphere stores and ripening chambers.
Hi-tech NVPH, fan-pad and climate-controlled greenhouses under NHB hi-tech component.
Bankable DPR using NHB-prescribed format, component-wise BOQ and cost basis.
NHB online portal registration, application filing and document upload.
Joint inspection coordination with NHB officers and bank representatives.
Subsidy claim filing after commissioning and back-ended release into no-lien account.
Each stage closes before the next one opens — nothing is ordered before the design is locked.
Component selection, capacity, location, eligibility check.
NHB-format DPR + online portal filing.
Bank loan tie-up + NHB Grant of Clearance (GoC) before any site work.
Execution + inspection + back-ended subsidy claim.
Indicative ranges only. Final cost depends on site, capacity, automation level, structural design, material grades and freight.
All figures indicative and subject to revision. Subsidy approval depends on the sanctioning authority and current scheme guidelines.
Most project failures start where one vendor’s scope ends and the next one’s begins. We carry the whole scope — and the paperwork that funds it.
| Scope | AgriMotion | Local | DIY |
|---|---|---|---|
| Bankable DPR + BOQ | |||
| OEM-genuine components | |||
| Engineering drawings (GA / P&ID / SLD) | |||
| Subsidy filing (NHB / MIDH / AIF) | |||
| Single-point project ownership | |||
| Post-handover AMC |
Still unsure? Speak to an engineer — not a sales desk.
NHB (National Horticulture Board, under Ministry of Agriculture) provides credit-linked back-ended capital subsidy for horticulture infrastructure — cold storage, polyhouse, packhouse, ripening chambers and integrated post-harvest projects.
NHB’s cold storage scheme pays a credit-linked, back-ended subsidy of 35% of eligible project cost in general areas and 45% in NE, Himalayan and special areas (NHB Public Circular of 21 August 2026). It covers stores above 5,000 MT, and eligible cost is worked out on capacity at NHB’s per-MT cost norms, not on the invoice. Stores up to 5,000 MT are funded under MIDH instead (cost norm ₹9,600/MT civil or ₹12,000/MT civil + PEB; 35%, or 50% in NE & Himalayan states). AIF interest subvention can be added on the loan portion.
Grant of Clearance (GoC): typically 60–90 days from filing. Bank sanction: parallel 60–120 days — no work at site and no term-loan disbursement before GoC. Joint inspection and subsidy release: 60–90 days post-commissioning. Total end-to-end: 9–15 months depending on project size.
NHB subsidy is back-ended — released only after project commissioning, physical verification by NHB officers, and submission of utilisation certificate by the financing bank. The borrower must fund construction through bank loan plus own equity initially. Work started before NHB’s Grant of Clearance makes the project ineligible.
NHB capital subsidy cannot be combined with MIDH or State Horticulture Mission assistance for the same project component — the schemes are mutually exclusive, so the right one is chosen per project. AIF 3% interest subvention can still be availed on the bank loan portion, reducing financing cost.
Bankable DPR, land ownership documents, KYC, project layout drawings, BOQ, bank in-principle term-sheet, PAN, GST, ITR (3 years for existing applicants), and PFMS-linked bank account for subsidy DBT.
Pricing ranges shown are indicative only and depend on site, scale, material grades, structural design, freight and current market conditions. Subsidy approval depends on the sanctioning authority and current scheme guidelines.
Official scheme documents for the rates on this page. Scheme rules change — confirm the current circular with the sanctioning authority before you apply.
“National Horticulture Board Operational Guidelines JANUARY 2025”
National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India · January 2025 · Read and archived
“PUBLIC CIRCULAR No.NHB/CC/Guidelines/2026-27”
National Horticulture Board, Ministry of Agriculture & Farmers Welfare, Government of India · 21 August 2026 · Read and archived
A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.