AgriMotion Engineering
    Representative solar for agriculture site photograph (category image, not this project)
    Solar EPC · Renewable Energy

    Solar Rooftop on Cold Storage — Anand

    Grid-tied solar rooftop offsetting 65% of cold storage electricity load. 4-year payback with net-metering.

    Background: solar for agriculture category image — not a photograph of this site.

    150 kW
    capacity
    Anand
    Gujarat
    2025
    year
    Commissioned
    status
    Project brief

    What went into it.

    • Tier-1 modules
    • String inverters
    • Net-metering
    • Commercial rooftop

    Scope of work

    AgriMotion Engineering executed this solar epc project on a turnkey EPC basis — covering design, structural engineering, procurement, civil and MEP installation, commissioning and post-handover AMC. The 150 kW unit was delivered in Anand, Gujarat during 2025.

    Funding

    No scheme on record.

    Schemes that usually apply to solar for agriculture projects:

    • PM-KUSUM — farm solar pumps
    • PM Surya Ghar — residential rooftops
    Check your scheme
    For your project

    How we’d approach yours.

    Rooftop and ground-mount solar for cold stores, packhouses and farms — sized against the refrigeration load it has to carry.

    1. 01Load study and system sizing
    2. 02Structure, modules and inverters
    3. 03Net-metering and scheme paperwork
    Solar for agriculture
    Solar for agriculture

    Everything we’ve published on this

    Solar for agriculture overview
    Start a project

    Want a similar project?

    A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.

    • An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
    • An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
    • No obligationYour details are used only to reply to this enquiry.
    Your details
    Your project

    No spam. Indicative estimate only — final quotation depends on site condition, specifications and current material rates.