
PM-KUSUM Solar Pump Cluster — Barmer
24 off-grid solar pump installations under PM-KUSUM Component-B for marginal farmers. End-to-end EPC + subsidy filing.
Background: solar for agriculture category image — not a photograph of this site.
- 120 kW (24 × 5 HP)
- capacity
- Barmer
- Rajasthan
- 2025
- year
- Commissioned
- status
What went into it.
- MNRE empanelled modules
- VFD controllers
- 60% central + state subsidy
- 5-year AMC
Scope of work
AgriMotion Engineering executed this solar epc project on a turnkey EPC basis — covering design, structural engineering, procurement, civil and MEP installation, commissioning and post-handover AMC. The 120 kW (24 × 5 HP) unit was delivered in Barmer, Rajasthan during 2025, with full PM-KUSUM subsidy documentation handled by our consulting team.
Built under PM-KUSUM.
30% central assistance plus the state share, for standalone and grid-connected farm solar pumps.
PM-KUSUM filing supportHow we’d approach yours.
Rooftop and ground-mount solar for cold stores, packhouses and farms — sized against the refrigeration load it has to carry.
- 01Load study and system sizing
- 02Structure, modules and inverters
- 03Net-metering and scheme paperwork
Same category or same state.
Cold StorageCommissionedCategory imageSikar, Rajasthan · 2025Multi-Commodity Cold Storage 100 MT — Sikar
Multi-chamber PEB cold storage with Daikin refrigeration. Designed for fruits, vegetables and spices at variable temperatures.
- Capacity
- 100 MT
- Scheme
- NHB
Solar EPCCommissionedCategory imageAnand, Gujarat · 2025Solar Rooftop on Cold Storage — Anand
Grid-tied solar rooftop offsetting 65% of cold storage electricity load. 4-year payback with net-metering.
- Capacity
- 150 kW
- Scheme
- —
Everything we’ve published on this
Want a similar project?
A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.
- An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
- An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
- No obligationYour details are used only to reply to this enquiry.
