AgriMotion Engineering
    Representative polyhouse & net house site photograph (category image, not this project)
    Polyhouse · Horticulture

    NVPH Polyhouse Cluster — Western UP

    Naturally ventilated polyhouse with drip + fertigation for capsicum and exotic vegetables. MIDH 50% subsidy claim filed.

    Background: polyhouse & net house category image — not a photograph of this site.

    1 acre NVPH
    capacity
    Bulandshahr
    Uttar Pradesh
    2025
    year
    Commissioned
    status
    Project brief

    What went into it.

    • Galvanized GI structure
    • 200 µm UV-stabilized film
    • Drip + fertigation
    • MIDH 50% subsidy

    Scope of work

    AgriMotion Engineering executed this polyhouse project on a turnkey EPC basis — covering design, structural engineering, procurement, civil and MEP installation, commissioning and post-handover AMC. The 1 acre NVPH unit was delivered in Bulandshahr, Uttar Pradesh during 2025, with full MIDH subsidy documentation handled by our consulting team.

    Funding

    Built under MIDH.

    50% of the cost norm, on up to 2,500 m², through the state horticulture mission.

    MIDH filing support
    For your project

    How we’d approach yours.

    Naturally ventilated and fan-pad polyhouses, net houses and shade nets — engineered to site wind load and matched to the scheme’s cost norm.

    1. 01GI structure designed to wind load
    2. 02Film, nets, cooling and fertigation
    3. 03Crop plan and subsidy documentation
    Polyhouse & net house
    Start a project

    Want a similar project?

    A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.

    • An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
    • An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
    • No obligationYour details are used only to reply to this enquiry.
    Your details
    Your project

    No spam. Indicative estimate only — final quotation depends on site condition, specifications and current material rates.