AgriMotion Engineering
    Representative warehousing & packhouse site photograph (category image, not this project)
    Warehousing · Agri Warehousing

    WDRA Warehouse — Agra

    WDRA-registered PEB warehouse for foodgrains and pulses, designed for negotiable warehouse receipt financing.

    Background: warehousing & packhouse category image — not a photograph of this site.

    2500 MT
    capacity
    Agra
    Uttar Pradesh
    2025
    year
    Commissioned
    status
    Project brief

    What went into it.

    • PEB structure
    • WDRA compliant
    • Loading docks
    • AIF financed

    Scope of work

    AgriMotion Engineering executed this warehousing project on a turnkey EPC basis — covering design, structural engineering, procurement, civil and MEP installation, commissioning and post-handover AMC. The 2500 MT unit was delivered in Agra, Uttar Pradesh during 2025, with full AIF subsidy documentation handled by our consulting team.

    Funding

    Built under AIF.

    3% interest subvention on loans up to ₹2 crore, for up to seven years.

    AIF filing support
    For your project

    How we’d approach yours.

    Pre-engineered warehouses, packhouses and grading halls planned around the flow from receiving bay to dispatch dock.

    1. 01PEB structure and flooring
    2. 02Grading, packing and pre-cooling
    3. 03Dock, drainage and utilities
    Warehousing & packhouse
    Warehousing & packhouse

    Everything we’ve published on this

    Warehousing & packhouse overview
    Specialist pages
    Resource centres
    Start a project

    Want a similar project?

    A crop, a capacity and a location are enough to begin. Share drawings or site photos on WhatsApp if you have them.

    • An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
    • An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
    • No obligationYour details are used only to reply to this enquiry.
    Your details
    Your project

    No spam. Indicative estimate only — final quotation depends on site condition, specifications and current material rates.