
Cold Room in Uttar Pradesh — Turnkey EPC by AgriMotion
- 0–400 km
- from our Sirsaganj head office
- 24 hours
- to a site survey
- ₹18–28 L
- typical from · Mushroom AC Room
- 6
- execution clusters · Lucknow, Kanpur
In short.
AgriMotion Engineering delivers cold storage & cold room construction across Uttar Pradesh — covering Lucknow, Kanpur, Agra, Firozabad and all districts. Indicative Uttar Pradesh pricing (2026): ₹18–28 L (Mushroom AC Room) · ₹65 L–1.1 Cr (100 MT) · ₹2.5–5 Cr (500 MT) · ₹5–8 Cr (1000 MT).
Why Uttar Pradesh for Cold Room?
- 01
AgriMotion HQ advantage — fastest engineering, supply and service response
- 02
India's largest potato and milk producing state
- 03
Strong MIDH / NHB / PMEGP implementation across all 75 districts
- 04
Excellent NH-19, Purvanchal & Yamuna Expressway connectivity
Subsidies available in Uttar Pradesh, filed for you.
UP Horticulture Mission disburses MIDH 50% for polyhouses, NHB 35% for cold storage, PMEGP up to 35% margin money. AgriMotion files via empanelled DPR consultants.
Subsidy is sanctioned by the scheme authority and is never guaranteed. We confirm the current window and cost norms with the department before you apply.
Key applications & crops.
- Potato
- Onion
- Mushroom
- Apple
- Dairy
- Mango
- Banana
- Vegetables
- Pharma & Vaccines
What’s included.
Daikin Channel Partner — genuine refrigeration equipment
01 / 04PUF panels 80–150 mm with PPGI/SS skin
02 / 04PLC controls + IoT temperature/humidity logging
03 / 04NHB 35% + AIF 3% subvention filed end-to-end
04 / 04
Indicative cost range.
Typical project bands for cold room projects in Uttar Pradesh. Your figure comes from the heat-load, layout and BOQ for your site.
₹18–28 L
Mushroom AC Room
₹65 L–1.1 Cr
100 MT
₹2.5–5 Cr
500 MT
₹5–8 Cr
1000 MT
Final cost depends on capacity, specifications and site conditions. Exact quote within 24 hours.

Typical project scope.
Cold Room — typical scope in the Lucknow region
A typical cold room project in the Lucknow region covers civil coordination, refrigeration / structure / electricals, commissioning and operator training, with subsidy filing handled in parallel. Daikin Channel Partner — genuine refrigeration equipment. PUF panels 80–150 mm with PPGI/SS skin.
An outline of the usual scope, not a record of a specific delivered project.
Our delivery commitment.
- 0–400 kmDistance from HQ
- AgriMotion is headquartered in Sirsaganj, Firozabad.
- 24 hoursSurvey & delivery
- Site survey within 24 hours. Local team plus factory advantage — fastest execution in India.
- BaseWhere we work from
- AgriMotion HQ, 90-91, Aroan Road, NH-19 Bypass, Opp. Praveen Resort, Sirsaganj, Firozabad
- Cold Room in LucknowCentral UP horticulture, mango belt and government tenders
- Cold Room in KanpurKanpur dairy & pharma cold storage cluster
- Cold Room in AgraPotato cold storage capital of India + Agra-Mathura mushroom belt
Cold Room in Uttar Pradesh — frequently asked questions.
Answers specific to this state. Still unsure? Speak to an engineer, not a sales desk.
Do you provide cold room services in Uttar Pradesh?
Yes. AgriMotion Engineering delivers cold storage & cold room construction across Uttar Pradesh — covering Lucknow, Kanpur, Agra, Firozabad and all districts. Site survey within 24 hours. Local team plus factory advantage — fastest execution in India.
What is the cost of a cold room project in Uttar Pradesh?
Indicative Uttar Pradesh pricing (2026): ₹18–28 L (Mushroom AC Room) · ₹65 L–1.1 Cr (100 MT) · ₹2.5–5 Cr (500 MT) · ₹5–8 Cr (1000 MT). Final cost varies ±10% based on capacity, site readiness, civil work and refrigeration specs. We share a detailed BOQ within 48 hours of enquiry.
Which subsidies are available for cold room in Uttar Pradesh?
UP Horticulture Mission disburses MIDH 50% for polyhouses, NHB 35% for cold storage, PMEGP up to 35% margin money. AgriMotion files via empanelled DPR consultants. AgriMotion handles the full DPR, application and bank coordination so you only sign and receive disbursement.
How long does a cold room project in Uttar Pradesh take?
Site survey within 24 hours. Local team plus factory advantage — fastest execution in India. Typical execution timelines: PUF panel supply 10–15 days; cold rooms / mushroom projects 8–14 weeks; polyhouse / hydroponics 45–100 days depending on size and Fan-Pad vs NVPH selection.
Which districts in Uttar Pradesh do you serve?
We serve every district in Uttar Pradesh. Primary execution clusters: Lucknow, Kanpur, Agra, Firozabad, Aligarh, Noida. Other districts are reached via our PAN India logistics network with on-site supervision from senior engineers.
Why choose AgriMotion as your cold room partner in Uttar Pradesh?
AgriMotion is an ISO 9001:2015 certified EPC company, authorised Daikin Commercial Refrigeration Channel Partner, with 500+ projects across 25+ Indian states. In Uttar Pradesh specifically — agrimotion hq advantage — fastest engineering, supply and service response — our integrated EPC + subsidy + service model removes vendor coordination headaches for promoters in Lucknow and Kanpur.
Do you offer site visits and free quotes in Uttar Pradesh?
Yes. We offer free initial consultation and BOQ-grade estimate within 24–48 hours. Paid site survey (refundable against PO) is scheduled within 24–72 hours of confirmation. Reach us at +91-7579975795 or via the form on this page.
More in Uttar Pradesh.
Everything we’ve published on this
Your cold room project, costed for your site.
Share the crop or commodity, the capacity and the district in Uttar Pradesh. An engineer replies with an indicative estimate, the schemes that fit and the next steps.
- An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
- An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
- No obligationYour details are used only to reply to this enquiry.




