
Mushroom Project in Delhi — Turnkey EPC by AgriMotion
- 300 km
- from our Sirsaganj head office
- 24 hours
- to a site survey
- ₹18–28 L
- typical from · small 1–2 chamber
- 4
- execution clusters · New Delhi, Najafgarh
In short.
AgriMotion Engineering delivers turnkey mushroom farm & cold room setup across Delhi — covering New Delhi, Najafgarh, Narela, Dwarka and all districts. Indicative Delhi pricing (2026): ₹18–28 L (small 1–2 chamber) · ₹45–80 L (commercial 4–6 chamber) · ₹1.2–2.5 Cr (industrial 10+ chamber).
Why Delhi for Mushroom Project?
- 01
India's largest premium consumer market — guaranteed offtake for cold-chain produce
- 02
Massive HoReCa, QSR and cloud-kitchen demand for cold rooms and ripening chambers
- 03
NCR proximity reduces refrigerated logistics cost by 30–40%
- 04
Strong push from Delhi Govt for urban farming, hydroponics and rooftop polyhouses
Subsidies available in Delhi, filed for you.
Delhi-NCR projects qualify under Central MIDH (50%), NHB (35%), AIF 3% interest subvention and PMEGP. AgriMotion files the entire claim end-to-end.
Subsidy is sanctioned by the scheme authority and is never guaranteed. We confirm the current window and cost norms with the department before you apply.
Key applications & crops.
- Button Mushroom
- Oyster Mushroom
- Milky Mushroom
- Shiitake
- Spawn Lab
- Composting Yard
What’s included.
14–18°C precision climate with Daikin cooling
01 / 04Automated humidity (85–95% RH) + CO₂ + fresh-air control
02 / 04100 mm PUF panel growing chambers
03 / 04PMEGP 25–35% + NHB 35% subsidy filing
04 / 04
Indicative cost range.
Typical project bands for mushroom project projects in Delhi. Your figure comes from the heat-load, layout and BOQ for your site.
₹18–28 L
small 1–2 chamber
₹45–80 L
commercial 4–6 chamber
₹1.2–2.5 Cr
industrial 10+ chamber
Final cost depends on capacity, specifications and site conditions. Exact quote within 24 hours.

Typical project scope.
Mushroom Project — typical scope in the New Delhi region
A typical mushroom project project in the New Delhi region covers civil coordination, refrigeration / structure / electricals, commissioning and operator training, with subsidy filing handled in parallel. 14–18°C precision climate with Daikin cooling. Automated humidity (85–95% RH) + CO₂ + fresh-air control.
An outline of the usual scope, not a record of a specific delivered project.
Our delivery commitment.
- 300 kmDistance from HQ
- From our Sirsaganj (UP) HQ — sub-24 hour mobilisation via Yamuna Expressway.
- 24 hoursSurvey & delivery
- Site survey within 24 hours. Material trucks dispatched within 48 hours of PO.
- BaseWhere we work from
- Service Office — Delhi NCR (visiting only)
- Mushroom Project in New DelhiNCR HoReCa, cloud kitchens and central-warehouse cold chain
- Mushroom Project in NajafgarhNCR peri-urban polyhouse & rooftop hydroponics belt
- Mushroom Project in NarelaNarela industrial area cold storage & food processing zone
Mushroom Project in Delhi — frequently asked questions.
Answers specific to this state. Still unsure? Speak to an engineer, not a sales desk.
Do you provide mushroom project services in Delhi?
Yes. AgriMotion Engineering delivers turnkey mushroom farm & cold room setup across Delhi — covering New Delhi, Najafgarh, Narela, Dwarka and all districts. Site survey within 24 hours. Material trucks dispatched within 48 hours of PO.
What is the cost of a mushroom project project in Delhi?
Indicative Delhi pricing (2026): ₹18–28 L (small 1–2 chamber) · ₹45–80 L (commercial 4–6 chamber) · ₹1.2–2.5 Cr (industrial 10+ chamber). Final cost varies ±10% based on capacity, site readiness, civil work and refrigeration specs. We share a detailed BOQ within 48 hours of enquiry.
Which subsidies are available for mushroom project in Delhi?
Delhi-NCR projects qualify under Central MIDH (50%), NHB (35%), AIF 3% interest subvention and PMEGP. AgriMotion files the entire claim end-to-end. AgriMotion handles the full DPR, application and bank coordination so you only sign and receive disbursement.
How long does a mushroom project project in Delhi take?
Site survey within 24 hours. Material trucks dispatched within 48 hours of PO. Typical execution timelines: PUF panel supply 10–15 days; cold rooms / mushroom projects 8–14 weeks; polyhouse / hydroponics 45–100 days depending on size and Fan-Pad vs NVPH selection.
Which districts in Delhi do you serve?
We serve every district in Delhi. Primary execution clusters: New Delhi, Najafgarh, Narela, Dwarka. Other districts are reached via our PAN India logistics network with on-site supervision from senior engineers.
Why choose AgriMotion as your mushroom project partner in Delhi?
AgriMotion is an ISO 9001:2015 certified EPC company, authorised Daikin Commercial Refrigeration Channel Partner, with 500+ projects across 25+ Indian states. In Delhi specifically — india's largest premium consumer market — guaranteed offtake for cold-chain produce — our integrated EPC + subsidy + service model removes vendor coordination headaches for promoters in New Delhi and Najafgarh.
Do you offer site visits and free quotes in Delhi?
Yes. We offer free initial consultation and BOQ-grade estimate within 24–48 hours. Paid site survey (refundable against PO) is scheduled within 24–72 hours of confirmation. Reach us at +91-7579975795 or via the form on this page.
More in Delhi.
Everything we’ve published on this
Your mushroom project project, costed for your site.
Share the crop or commodity, the capacity and the district in Delhi. An engineer replies with an indicative estimate, the schemes that fit and the next steps.
- An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
- An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
- No obligationYour details are used only to reply to this enquiry.




