
Polyhouse in Karnataka — Turnkey EPC by AgriMotion
- ~1400 km
- from our Sirsaganj head office
- 7 business days
- to a site survey
- ₹35–50 L/acre
- typical from · NVPH
- 5
- execution clusters · Bengaluru, Mysuru
In short.
AgriMotion Engineering delivers polyhouse / greenhouse turnkey construction across Karnataka — covering Bengaluru, Mysuru, Mangaluru, Hubballi and all districts. Indicative Karnataka pricing (2026): ₹35–50 L/acre (NVPH) · ₹55–80 L/acre (Fan-Pad) · MIDH subsidy capped at 2,500 sqm (max ≈ ₹12.5 L NVPH / ₹18.75 L fan-pad).
Why Karnataka for Polyhouse?
- 01
Bengaluru — India's highest-value premium produce market
- 02
Year-round moderate climate ideal for polyhouse/hydroponics
- 03
Strong MIDH implementation with reliable disbursement
- 04
Established premium retail & HoReCa channels in Bengaluru
Subsidies available in Karnataka, filed for you.
MIDH 50% subsidy via Karnataka State Horticulture Department. RKVY support for hi-tech agriculture. UAS Bengaluru provides free technical guidance and training to subsidy recipients.
Subsidy is sanctioned by the scheme authority and is never guaranteed. We confirm the current window and cost norms with the department before you apply.
Key applications & crops.
- Coloured Capsicum
- Cherry Tomato
- Cucumber
- Gerbera
- Rose
- Carnation
- Herbs
- Strawberry
What’s included.
ISI-grade GI pipe structures with 10-year galvanisation warranty
01 / 04200 micron UV-stabilised film (NVPH) or Fan-Pad with cooling
02 / 04Integrated drip + fertigation + automation
03 / 04MIDH 50% subsidy filed via empanelled DPR consultants
04 / 04
Indicative cost range.
Typical project bands for polyhouse projects in Karnataka. Your figure comes from the heat-load, layout and BOQ for your site.
₹35–50 L/acre
NVPH
₹55–80 L/acre
Fan-Pad
MIDH subsidy capped at 2,500 sqm (max ≈ ₹12.5 L NVPH / ₹18.75 L fan-pad)
Final cost depends on capacity, specifications and site conditions. Exact quote within 24 hours.

Typical project scope.
Polyhouse — typical scope in the Bengaluru region
A typical polyhouse project in the Bengaluru region covers civil coordination, refrigeration / structure / electricals, commissioning and operator training, with subsidy filing handled in parallel. ISI-grade GI pipe structures with 10-year galvanisation warranty. 200 micron UV-stabilised film (NVPH) or Fan-Pad with cooling.
An outline of the usual scope, not a record of a specific delivered project.
Our delivery commitment.
- ~1400 kmDistance from HQ
- . Dedicated South India execution partner in Bengaluru.
- 7 business daysSurvey & delivery
- Site survey within 7 business days. 90–120 day project delivery.
- BaseWhere we work from
- Service Office — Bengaluru, Karnataka (visiting only)
Polyhouse in Karnataka — frequently asked questions.
Answers specific to this state. Still unsure? Speak to an engineer, not a sales desk.
Do you provide polyhouse services in Karnataka?
Yes. AgriMotion Engineering delivers polyhouse / greenhouse turnkey construction across Karnataka — covering Bengaluru, Mysuru, Mangaluru, Hubballi and all districts. Site survey within 7 business days. 90–120 day project delivery.
What is the cost of a polyhouse project in Karnataka?
Indicative Karnataka pricing (2026): ₹35–50 L/acre (NVPH) · ₹55–80 L/acre (Fan-Pad) · MIDH subsidy capped at 2,500 sqm (max ≈ ₹12.5 L NVPH / ₹18.75 L fan-pad). Final cost varies ±10% based on capacity, site readiness, civil work and refrigeration specs. We share a detailed BOQ within 48 hours of enquiry.
Which subsidies are available for polyhouse in Karnataka?
MIDH 50% subsidy via Karnataka State Horticulture Department. RKVY support for hi-tech agriculture. UAS Bengaluru provides free technical guidance and training to subsidy recipients. AgriMotion handles the full DPR, application and bank coordination so you only sign and receive disbursement.
How long does a polyhouse project in Karnataka take?
Site survey within 7 business days. 90–120 day project delivery. Typical execution timelines: PUF panel supply 10–15 days; cold rooms / mushroom projects 8–14 weeks; polyhouse / hydroponics 45–100 days depending on size and Fan-Pad vs NVPH selection.
Which districts in Karnataka do you serve?
We serve every district in Karnataka. Primary execution clusters: Bengaluru, Mysuru, Mangaluru, Hubballi, Belagavi. Other districts are reached via our PAN India logistics network with on-site supervision from senior engineers.
Why choose AgriMotion as your polyhouse partner in Karnataka?
AgriMotion is an ISO 9001:2015 certified EPC company, authorised Daikin Commercial Refrigeration Channel Partner, with 500+ projects across 25+ Indian states. In Karnataka specifically — bengaluru — india's highest-value premium produce market — our integrated EPC + subsidy + service model removes vendor coordination headaches for promoters in Bengaluru and Mysuru.
Do you offer site visits and free quotes in Karnataka?
Yes. We offer free initial consultation and BOQ-grade estimate within 24–48 hours. Paid site survey (refundable against PO) is scheduled within 5–7 business days of confirmation. Reach us at +91-7579975795 or via the form on this page.
More in Karnataka.
Everything we’ve published on this
Your polyhouse project, costed for your site.
Share the crop or commodity, the capacity and the district in Karnataka. An engineer replies with an indicative estimate, the schemes that fit and the next steps.
- An engineer calls backUsually the same working day — someone who can talk loads, layouts and schemes.
- An indicative estimateCapex range, scheme fit and next steps, before any paid DPR work.
- No obligationYour details are used only to reply to this enquiry.




